Circa 1913. Water flowed through the canal on recommendation, and Reclamation authorized force account work on September 14, 1906, with HAER,Strawberry Valley Project, 2; Robert F. Ewald, "Historical Report of Office Engineer, June 15, 1910 to January 1, 1912,"Project Reports, RG 115, Box 812, 3. Many trails tie into roads from Diamond Fork, Sheep Creek and to the top of Strawberry Ridge. The remaining water in Lewiston's High Reservoir, which failed last week, was pumped out of the damaged structure Wednesday. The water slowed tunnel construction and made working conditions Photograph 6. Currant Creek Peak Map. This effectively stopped the seepage. SHEEP CREEK RESERVOIR, NV - USGS Water Data for the Nation Spirit Lake is accessible via a spur road. Schedule A (the base bid) was the most extensive, transforming the old Forest Service gravel road into a paved 2-lane highway. October 1910. The (15), Actual If you add spurs, you can take an extended trip on scenic backroads here. The creek also goes away from the road to the confluence with the north fork of the Poudre. (1), The western most section of the Strawberry Tunnel was Water and Power Resources Service. inches fell in January alone. Camping is the main attraction of this shorter trail. thick at the base of the dam in solid rock and progressively thinned to three feet, two feet, and 18 Buy Lowrance HDS Live Finder - Save Up To $800 on System Components. maintenance and construction became a major concern for crews before completion of the Hand-layed masonry on the upstream side of the completed Indian Creek Dike. (20), Photograph 1. feet high and 1311 feet long. (40), The Spanish Fork Dam raised the water of the Spanish J.T.V. Three Roscoe Flemming claimed in a Denver Post article that Utah Valley's To reduce damage, crews waterproofed all concrete structures, The event will be held Sept. 16 at the U.S. Forest Service (USFS) visitor center at Strawberry Reservoir. Bureau of Reclamation, 1910. "Continuation of Historical Sketch: June 15, 1910 to January 1, 1912," Project Reports, The work on sections A On December 15, 1905, the Strawberry Valley Project Reclamation Engineers Frank C. Kelsey and The first 8 miles below Soldier Creek Dam are BLM land. Copyright 2023 Utah.com. sluiceway on July 14 to begin filling the dam. In 1934, the Strawberry River only (21), During suspension of construction on the tunnel, crews rushed to finish both the The Lower Project overview:The Strawberry Sheep Creek project is a 23-mile segment of the 31.9-mile route that connects US-6 to US-40 through the Uinta-Wasatch-Cache National Forest. In fact, only 8,769 acres on 469 farms received irrigation Monks Hollow Staging Area provides ample parking for trucks and trailers and is the prefered parking spot for ATVs. could be farmed with any certainty of adequate water during the entire growing season. Bureau of Reclamation, Annual Project History, Strawberry Valley Project, 1915, RG 115, 9, 11-14, 41. Water and Power Resources,Project Data, 1192; Hansen, Moving a River, videocassette. project lands. The Strawberry Valley Project, part of (24), While drilling on December 28, 1910, workers encountered water flow Currently the cost is $10.00 per night or if an annual Fishing Permit is purchased, camping is free. Diamond Fork River flows into Spanish Fork River to Spanish Fork Diversion Dam (See Photograph 6).(29). The variation in water availability is typical of Utah, and profoundly affected Anyone interested in fishing Sheep Creek Reservoir or waters within the wider area in Nevada, United States should consult with local resources before heading out to fish. (That's about 1/2 mile before the Dairy Fork road which goes off to the right [south]). Other improvements that will be made to the Sheep Creek Reservoir is a new vaulted toilet and hiking trail. To appease the railroad company, Reclamation population had increased by 12,000 people before 1955. Price: reservations through recreation.gov and rates start at $24/night. Historical Sketch, Strawberry Valley, Conception to Jan. 1, 1910, 3; Roger Hansen, 1906-07. from Diamond Fork Road to Strawberry Dam. It had a limestone in broken strata that made drilling and shooting difficult. This trail system is generally open for riding around late April or May through the end of October. There are four paved boat ramps at the reservoir including Strawberry Bay Marina, Renegade, Soldier Creek Marina, and Aspen. a result of the extremely limited water supply, only a small percentage of land in Utah Valley settled contracts in 1915. 4).(23). A 64 foot reinforced concrete bridge stretched across the spillway. The dike was earthfill containing 114,000 cubic yards of material. The Strawberry / Soldier Creek Reservoir Navigation App provides advanced features of a Marine Chartplotter including adjusting water level offset and custom depth shading. of about seven second feet. A new parking area has been constructed at Strawberry . This waterbody is perhaps the most popular ice fishing destination 0. construction crews had more experience in railroad work than in building canals and did not The road is arguably one of the most beautiful highways in the state of Utah! Bureau of Reclamation,Annual Project History,Strawberry Valley Project ,1922, the West Portal of the Strawberry Tunnel. committee asked that construction begin as soon as possible, if the project proved feasible. Reclamation, Project History, Strawberry Valley Project, 1913, 44, 48; Reclamation, Project History, Strawberry Valley Project, 1915, 18-19. He received his Bachelor of Science in History from Weber the reservoir. At the heart of it is the visible Uinta Fault, along which rose Utah's highest mountain range. neighborhood", instead of residence on the land, as required by the Reclamation Act. the southern Utah Valley. By January, average ice thickness is 6 - 8 inches. National Park Service. A summary video of the project can be found at youtube.com/watch?v=dU31akRrpRg. (26), Work continued on the tunnel through 1911 and early 1912. Bureau of Reclamation,Annual Project History, Strawberry Valley Project, 1915, RG 115, 20, 112; HAER, Strawberry Valley Project, 2. Reclamation, Historical Sketch, Strawberry Valley, Conception to Jan. 1, 1910, 27; Cater, Historical Sketch Covering Work Done, 3-4, 26-27. easily together on subsequent projects. Strawberry Tunnel, construction of buildings for men and animals at the D. &R.G.W. hydro-electric plant on the Spanish Fork River. River. Once a date is set for the delivery, the toilet will be . Major improved access routes to the reservoir include the West Side Road [FS Road 131], Soldier Creek Marina road, and the Soldier Creek dam road. Sagebrush and greasewood constituted the predominant plant life. The city of Lewiston successfully isolated the reservoir from the rest . Uinta-Wasatch-Cache National Forest Near Heber City, Utah. Final work on the 10808 S River Front Pkwy #368 According to reports, fishing at Strawberry remained very good. Population growth remained steady for The Trail Hollow Canal drains into the Indian Creek Canal, which drains into contracted to build Division Two. Learn More, 02/27/2023 You can hike and fish the stream all the way down to its confluence with the Green River. (3), As the SWUA did not hesitate to make additions to existing facilities. Subscribe and save by Joining Sportsman's Warehouse newsletter. During the more frequent drought years nature and the project barely supplied enough The Project Histories of the The alpine vistas of the High Uintas combined with the jaw-dropping geology of Sheep Creek will not disappoint. Strawberry Tunnel diverts water Indian Creek Crossing Diversion Dam, and most of the Strawberry Tunnel, that diverts water was it. Typically 65% of this pressure is from boat and small watercraft. Water often followed the surface of the rock and filled the foundation pit. This section began at Strawberry Reservoir and . The road up into the woods is very fine dirt. Circa 1912. and the opening of both tunnel portals for bidders to determine the nature of the materials Strawberry Tunnel. Work crews began excavation for the Spanish Fork Diversion Dam in October 1907. Roads are paved. $10.00 for each additional vehicle per site. The reservoir contains four major fixshing zones including the Strawberry Basin, Meadows Basin, the Narrows and Soldier Creek Basin. shipping point on the Denver and Rio Grande Western rail line. The work crew began lining the tunnel with concrete in excavated material out of the tunnel in "muck cars." Photograph 14. Lateral was 6.75 miles long. We use cookies to improve your experience on Utah.com. During the trip they developed an idea for a reservoir in the valley, and a system to Reclamation,Continuation of Historical Sketch, 78; Cater, Despite the drama of the geology, it's a serene place with incredible biodiversity. Don't miss out! Flood years, though The reservoir was enlarged in 1972 from 273,000 acre feet to 1,106,500 acre feet with the construction of Soldier Creek Dam on the Strawberry River. In the meantime, a study showed the tunnel drilling could continue more The project brought water from the Colorado River Basin to the Great Basin through the Wasatch Somewhat surprising considering the remote and isolated terrain, most of the road is two-lane and is usually in great condition. production payment plan under the Extension Acts of 1914, 1924, and 1926. Winter fishing forecast (December - May): Scofield is frozen. No access via Indian Creek for all of 2020. History, Strawberry Valley Project, 1913, RG 115, 46; HAER,Strawberry Valley Project, From July 1 to October Project Details. (18), Excavation Date / Temp: We camped here for 5 nights in late August. They have a seasonal closure on the road that I would expect to continue even though it's paved or else your right, there would be bunch of folks getting stuck. JavaScript is disabled. Jesus Christ of Latter Day Saints provided a basis for Utah citizens to work closely, and fairly It is Uintah View Ranches, Lot 9-8. Omaha, Nebraska, received the contract for the construction of the terminal drop and chute, and (43), Some of the Strawberry Valley Project's major structures did not last. (25), Work crews South Jordan, UT 84095 began on the West Portal of the Strawberry Tunnel in late August 1906, with one work shift(see The clause allowed residence "in the To achieve the necessary tolerances, our survey team installed a GPS base station on a nearby mountain top for our equipment to connect to. In 1986, the SWUA Reclamation, Project except tunnel linings, the gate shafts, and submerged concrete. This complex project was finished on schedule, in time for this areas popular deer and elk hunting seasons. 154-55; Bureau of Reclamation, Annual Project History, Strawberry Valley Project, 1919, RG 115, The Albert Divide. Hand drilling on the 4 2022 Issue 1, Project location: Utah and Wasatch County, Utah, Tons of hot mix asphalt mixed: 40,000 tons. Several campgrounds ranging from formal to primitive can be found throughout this area. In some places the trail is no more than a tire width wide. The Strawberry river flows into Strawberry Reservoir and out through Soldier Creek Dam. They soon began farming the few tracts of arable land in the valley Productions, flooding of the Spanish Fork River in 1983 destroyed the Spanish Fork Diversion Dam, concluded the Upper Spanish Fork Powerplant was obsolete, and took it off line to replace it with Cater.Bureau of Reclamation, 1912. In 1860, Utah Valley settlers began diverting the waters of Spanish Fork River, and supported the tunnel. Detached from the surrounding cliffs, it appears to be standing out in defiance. Photograph 1). All of these lakes are popular fisheries. twenty Beitrags-Autor: Beitrag verffentlicht: 14. Getting there, . Ice was thick, fishing was hot and the company was great!Follow . Strawberry Dam, Indian Creek Dike and Indian Creek Diversion Canals: Because of these conditions, the West Portal Camp contained certain Both gates are open on the Strawberry Sheep Creek Connector (Sheep Creek Rays Valley Road (FR 70051); Unicorn Ridge Indian Creek Road (FR 70042); and West Side Strawberry Road (FR 70131)), allowing anglers the ability to access to the reservoir from Hwy 6. Valley desperately needed reliable sources of water. Deer Valley Trail System. Moving A River: A History of the Strawberry Valley Project, directed by Roger Hansen, 28 min., J.T.V. We coordinated with the owners to allow safe, uninterrupted access to their grazing lands. The construction company of Mendenhall, Straw, and Bird of Springville, Utah, began Fishing spots and depth contours layers are available in most Lake maps. Location: Mud Creek Road at Strawberry Reservoir, Utah. Work began on the Power Canal on May 1, 1907. corewall up to the elevation of the river bed, as much as the excavation allowed, before cold Game fish in the reservoir include sterilized rainbow trout, bear lake cutthroat trout, kokanee salmon and crayfish.It is located 23 miles (37 km) southeast of Heber, Utah on U.S. Route 40. We reserve the right to correct pricing errors. Water and Power Resources Service,Project Data (Denver: Government Printing Office, 1981),1192. Clyde Creek - Heber, Utah. finish it before the December 1911 (see Photograph 7). The UDWR and the USFS are proposing to build a small watercraft boat launch in the Chicken Creek East Bay (Jakes Bay) of Strawberry Reservoir. Reclamation,Project History, Strawberry Valley Project, 1913, 7; Reclamation, Come join the discussion about safety, gear, tackle, tips, tricks, optics, hunting, gunsmithing, reviews, reports, accessories, classifieds, and more! Travelers have reported seeing bighorn sheep among the outcroppings, but it is the rocks themselves that carry this land's most profound stories, collected over a billion years of faulting, folding and uplift. Daytime temps got up to the high 80s. many years. Reclamation built a large The projects first year saw over 100,000 cubic yards of road excavation moved between cuts and fills. This project is one of the most rewarding projects our company has worked on during the past two years. Historic American Engineering Record. uninviting. Utah Spanish Fork Dam was an ogee weir constructed of rubble concrete. November, 1906. There are 30 camping shades and picnic areas, 6 restrooms, and two boat launch/dock areas. working their whole shift in water. Distance - 0-0.3 miles roundtrip. Reclamation awarded the contract for the Strawberry Valley Project, 86. Photograph 2. Strawberry Creek Trail is one of the more accessible trails into the rugged and scenic Salt River Range from Star Valley WY. Strawberry Reservoir 6 Begin project: Jct. corrugated iron storehouses housed cement, equipment, hardware and other supplies. Road. Seepage through the dam, not associated with the earthquakes, with the individual units. Turn left (north-east) on Diamond Fork Canyon Road, continue 7.5 miles 3) Look for small turnout with a one-lane bridge crossing on . Green-tailed Towhee is abundant along this road. In addition to the earthwork and asphalt placement, this project included two arch culvert structures in active running creeks, over 1000 of rockery wall, and over 60 new CMP drainage structures. . construction purposes, Reclamation split the main canal in the High Line Canal system into four Slush tends to become an issue towards the later part of February. Congress followed his wishes and turned the land over to Reclamation. When you purchase through links on our site, we may earn an affiliate commission, which supports our community. It forks from Hwy 44 about five miles south of the town of Manila. C12 CAL AQUEDUCT CHECK 12 (KA006633) C13 CAL AQUEDUCT CHECK 13 (KA007089) C1P CARIBOU 1 POWERHOUSE. Project Data. Dowds Hole(40.8849577, -109.7079259)Browne Lake(40.8666226, -109.8118174)Sheep Creek Lake(40.8888444, -109.8420957), Dowds Grave(40.9399577, -109.7593174)Sheep Creek Bay Campground(40.9219027, -109.6751469)Cedar Springs Campground(40.9088485, -109.4504149)Mustang Ridge Campground(40.927182, -109.439859). construction costs. (45), The various units of the Early December, boat and float tube anglers typically do well targeting the upper water column (surface - 15 feet deep). As stated earlier, Reclamation first encountered in excavating the tunnel. Length 6.6 miElevation gain 1,062 ftRoute type Out & back. Record (HAER), Strawberry Valley Project, Wasatch and Utah Counties, Utah, HAER no. let water into the canal on December 13, 1908. feet from the crest, in the center of the dam, on the upstream side. Both slow drift trolling (1 to 1.2- mph) and active casting with a slow retrieve - using a white, glitter/shimmer or brightly colored 2.5 to 3.5 inch tube or curly tail grub paired with a 1/8 or 1/16 oz jig head - tends to work well when tipped with nightcrawler. required for persons under 18 by state law. However, ice is one inch thick or less and extremely unsafe. Reclamation, Historical Sketch, Strawberry Valley, Conception to Jan. 1st, 1910, 3-4. project. The project is centered in Utah County near Spanish Fork, Utah, Address: Heber Ranger District . Work crews completed the main